News

Home / Press / News /

20MW/40MWh Energy Storage Power Station

20MW/40MWh Energy Storage Power Station

September 08,2023

On May 18, 2023, the 100MW photovoltaic power generation 20MW/40MWh energy storage system equipment for Jinwu Highway in Jinchang City, Gansu Province, manufactured and supplied by Aulanbel Energy, was successfully delivered.




In order to adapt to the extreme weather environment in the northwest, the Aulanbel technical team worked hard and contrapuntally research design solutions. It is understood that the project adopts an integrated system design plan, equipped with 280Ah energy storage cells, in the form of an outdoor 45ft prefabricated cabin, and equipped with fire protection, temperature control, monitoring, leakage protection, thermal management system, battery management system and other equipment. It can effectively ensure that the battery is protected from smoke, water vapor and dust pollution, and improve the efficiency and reliability of system operation.

The energy storage system project was successfully completed. On the one hand, it has positive significance for adjusting the energy supply structure of Jinchang, meeting Jinchang's electricity demand, and promoting energy conservation and emission reduction. On the other hand, it has improved the visibility of Aulanbel in China and is of great significance to the company's scale development.
Top

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

Company

Contact us